Septic Tank Repair Union City GA

Tips to be a Successful Septic Tank Owner

The average household septic tank system should be inspected at least every three years by a professional septic tank company. Residential septic tanks are typically pumped every three to five years.

Four major factors influence the frequency of septic tank pumping:

•Size of Household
•Total wastewater generated
•Volume of solids in wastewater
•Size of septic tank

What happens when a septic tank company is coming to inspect your septic tank:

When you call a Union City septic tank company, they will inspect for leaks and examine the scum and sludge layers in your septic tank.

It is important to keep maintenance records on the work performed on your septic tank system.

Your septic tank includes a T-shaped outlet which prevents sludge and scum from leaving the septic tank and traveling to the drainfield area. If the bottom of the scum layer is within six inches of the bottom of the outlet, or if the top of the sludge layer is within 12 inches of the outlet, your septic tank needs to be pumped.

To keep track of when to pump out your tank, keep a diary of the sludge and scum levels found by the septic professional.

The licensed plumbing company should note repairs completed and the septic tank condition in your system’s service report. If other repairs are recommended, hire a Union City  professional septic tank company soon.


Previous | Next


Septic Systems: Their Problems and Maintenance

Septic Tank Drainfield Problems

Septic Tank Sewage Treatment Systems

These provide a very crude method of treating sewage for properties which are not connected to mains drainage. Many septic tank systems throughout the world are never maintained and so do not work properly and pollution control laws exist to try to limit the amount of environmental and health risks they cause. These laws are getting tighter, and minimum standards have been put in place for new or replacement septic systems. In many cases you will need to install a sewage treatment plant system instead. Always get the sewage system checked by a wastewater system expert prior to purchasing a property in order to prevent a pollution problem.

Types of Septic Tank Systems Available

There are various types of septic tank systems. They consist of an underground septic tank in differing shapes and sizes, which then connects to a secondary soil treatment system, usually a land drainage system in the form of a soakaway or drainfield, or a mound soakaway.

How a Septic Tank works

Raw sewage and wastewater from baths, kitchens, etc. discharges into the tank, where the solids are separated from the liquid waste. Fats and oils float to the top of the tank and form a crust layer. Faeces and food scraps sink to the bottom of the tank and form a sludge layer. Anaerobic bacteria which are natural colonisers in the tank "digest" this sludge by up to 70%.

The dirty septic water flows out of the tank to a soakaway or drainfield. Baffles or 'T' pipes in the tank hold back the floating crust and prevent it from entering the outlet of the tank. In order that the sludge and crust layers do not become too deep, septic tanks should be emptied annually. This also prevents a higher and higher concentration of suspended solids washing out into the soakaway. Solids can block the air spaces in the soil drainage system, creating a drainage problem and the septic tank effluent will not be able to soak away or be treated by the natural soil bacteria.

Variations in Septic Tank systems

Traditional septic tanks comprise of two rectangular chambers: the first one being 2/3 of the whole and the second 1/3, usually built in brick or concrete. Strict design rules are in place and septic tanks must be designed in accordance with BS 6297 1983. The inlet pipe into the first chamber ends in a 'T' pipe which travels down the at least 450mm (18") below top water level (TWL), and the chamber must be a minimum of 1500mm (5'-0") deep from TWL. This first stage chamber is usually twice as long as it is wide. The pipe from the first chamber into the second chamber consists of an 'H' pipe and the bottom of the pipe is a min. of 300mm (12") below TWL in the first chamber and 450mm (18") below top water level (TWL) when it enters the second chamber.This second stage chamber is usually square. The outlet pipe from the second chamber of the tank also consists of a 'T' pipe with the bottom of the pipe 300mm (12") below TWL.

Site Conditions and Installation

Most sites in the UK are not suitable for septic tank systems. Either the soil contains too much clay or is too porous, or the winter water table or bedrock is too near the surface. If the soil is clay, then it will not soak the septic effluent away and if it is too coarse it will not retain the effluent long enough for treatment. You could consider a non-electric sewage treatment plant instead. Sometimes, it is possible to adapt a septic system to suit a basically unsuitable site, but this requires careful planning and design by an expert. As a general rule, if the site has either insufficient soil depth, or the wrong type of soil, it is not suitable for a septic system. Always contact your Building Inspector before deciding on a septic system.

The size of a septic system, both the tank and the soakaway area, is determined by the number of bedrooms in the house and porosity of the soakaway soil. A septic system cannot work if it is overloaded, so always bear in mind any plans you may have for extending the property before you decide on the size of the septic system. Increasing the size later results in a ruined garden.

Finally, always check with the Environment Agency and you local Building Control before deciding on a septic system in [post_name]. They will have a very good idea as to whether it is likely to work in your area and could save you thousands of pounds in replacing an unsuitable septic installation.


What Is an Anaerobic Septic System?

Septic Tank Maintenance Cost

The drainage industry is growing in leaps and bounds. The rise in heavily packed households and town ships where drainage systems are implemented with more planning and precision, importance has been given to the maintenance aspect of the drainage industry sector. Both in the commercial and domestic sectors, drainage companies have brought in many new technologies for the better treatment of drainage and sewages. Technologies such as CCTV surveys are very popular amongst the drainage companies, but the most popular and most preferred drainage related issues are high pressure water jetting equipment.

High pressure water jetting is done by using drain jetting equipment which can also be named jet vaccumation. Water is pumped by using large pressure into the drainage lines or sewage lines. This cleans all the debris and other wastes that are accumulated in the drain. Using this method is any easy way to clean the pipe line. High pressure water jetting can help to bring the drainage line back to its original condition without replacing the pipeline. Cleaning drains with high pressure water jetting equipment is a cost effective method. If jetting machines are used for drainage cleaning, the work becomes easy and value for money.

Cleaning your drains with high pressure water jetting machines are far more effective than using any other methods of drain cleaning. Cleaning the drain with a water jetting machine can make the drain cleaner for a longer period. Using quality material for your plumbing works is very important in the drainage design. If low quality pipes are used in your installation of your drainage, there are chances for the pipes to break while water is pumped in with high pressure. Finally, you will have to reinstall the entire drainage system, which will be a costly affair. Effective use of water pressure jetting equipment is possible only with all these factors in mind.


New Drain Line Installation Union City Georgia